SMD eCFE

Subsea SeaJet Controlled Flow Excavator — First-Principles Hydrodynamic, Two-Strata & Berm Modelling Suite

Source of Truth: SMD Manuals (Subsea Operations-CFE, Excavator Assy-CFE, Launch+Recovery-CFE) · SME 185 kW Motor Manual · C3094 FAT · AP4400 (Rev 9) · Gemini NBI (0695-SOM-00005)

Excavated Trench -- --
Created Spoil Berm -- --
Seabed & Horizon Shear -- --
Attitude & Clump Pull -- --
Sonar Look-Window -- --

1:1 True-Scale 2D CAD Blueprint — SeaJet, Hanging Clump Weight, Two-Layer Strata & Berm

100%

Searches every outer/inner pin angle (12° steps), fore–aft pin, rail position, nozzle pair, RPM (90–440), stand-off and vessel speed for one pass, with your current strata held fixed and no current. Setups are not limited by the clump: each row shows the clump weight needed to hold station (red if more than your current clump). Each row is the setup that digs the least hole for that berm size. Positions are offsets from the tool track (+ = starboard, the throw side). The current check re-runs each row at 0.25–2 kt in 8 directions and shows the lowest current at which half the berm is lost (— = holds to 2 kt).

Berm (m²/m) Crest height Usable berm (m²/m, extent) Berm position (start → crest → end) Hole (m²/m) Trench depth × width Berm ÷ hole Vehicle & Tool Setup Running Parameters Clump needed Current check: half berm lost at (kt) by direction